Headwinds and Challenges
- The global business environment continues to face multiple
challenges, including geopolitical tensions, tariff uncertainties,
supply chain adjustments, and regional conflicts, as described by CFO
Manmohan Sharma in the Q1 FY27 press release dated July 22, 2026.
- Q1 FY27 performance moderated on a sequential basis: revenue from
operations declined 16.16% QoQ (from Rs. 1,102.40 crores in Q4 FY26 to
Rs. 924.25 crores), EBITDA declined 16.12% QoQ, and PAT declined 23.60%
QoQ.
- Margins compressed year-on-year in Q1 FY27: EBITDA margin fell to
18.77% from 19.49% in Q1 FY26, and PAT margin fell to 12.87% from
14.32%.
- Finance costs rose sharply year-on-year in Q1 FY27 (Rs. 9.59 crores
versus Rs. 3.56 crores in Q1 FY26), and depreciation also increased (Rs.
5.78 crores versus Rs. 2.23 crores).
- The 210MWp (150MWac) EPC order announced August 5, 2026 was awarded
by Solaris Horizon Energy Private Limited, a step-down subsidiary of
Waaree Energies Limited, and falls within related party transactions;
the disclosure states it is done at arm’s length.
- The AGM notice for the 27th AGM (September 23, 2026) includes
approval of material related party transactions with Waaree Energies
Limited, Waaree Forever Energies Private Limited, Waaneep Solar One
Private Limited, and Lumina Greentech Private Limited, indicating a
continuing volume of group-related transactions.
Tailwinds and Growth Prospects
- India’s installed renewable energy capacity stood at over 288 GW as
of June 2026, with solar capacity crossing 162 GW and remaining the
leading driver of the clean energy transition; India targets 500 GW of
non-fossil fuel capacity by 2030.
- Government policies cited in the Q1 FY27 earnings presentation
include PM Surya Ghar Muft Bijli Yojana (₹75,000 crores; 1 crore rooftop
homes by March 2027, with 33 lakh done), 55 solar parks with ~40 GW
sanctioned capacity across 13 states, PLI Tranches I & II (₹52,942
crores committed for 48 GW of integrated solar PV manufacturing), a 100
GW wind target by 2030, BESS VGF schemes (~43 GWh), ISTS waiver for
co-located BESS projects, and National Electricity Plan (Transmission)
capex of ~₹4.9 lakh crores through FY2027-32.
- Crisil projects solar capacity additions in India of ~156–164 GW
over fiscals 2027–2030.
- Consolidated unexecuted order book stands at ~₹5,300 crores (EPC
solar + BESS of ~₹2,600 crores and T&D of ~₹2,700 crores), with a
bidding pipeline of 37 GWp+ solar, 10 GWh+ BESS, and ₹20k crores+
T&D.
- Recent order wins include a 1,520 MWh BESS order and a 450 MWp
ground-mounted solar project (both Q1 FY27), a 291 MWp solar PV project
with 280 MWh BESS from an Indian thermal power generating company
(scheduled for completion in FY2027-28), and the 210MWp (150MWac) order
from Solaris Horizon Energy Private Limited (announced August 5, 2026,
scheduled for completion in FY2027-28).
- The company acquired a 55% equity stake in Associated Power
Structures Pvt. Ltd. (APSPL), strengthening T&D capabilities; APSPL
has manufacturing locations at Bamangam and Manglej, Gujarat.
- The company is pursuing EPC opportunities in Battery Energy Storage
Systems and data centre infrastructure. It incorporated Aurovault Data
Centers Private Limited on September 14, 2026 as a wholly-owned
step-down subsidiary (under Waaree Green Data Centers Private Limited)
for data centers, hyperscale data centers, AI-ready data centers, and
digital infrastructure.
- O&M portfolio stands at ~1,154 MWp, with plans to expand
third-party O&M through organic and inorganic routes and
differentiated services such as drone thermography and analytics.
- IPP assets: 82.82 MWp of solar generating assets developed, with an
additional 198.6 MWp IPP plant being set up.
- Credit rating upgraded to A+, Stable (CARE).
Key Risks
- Related party concentration: the 210MWp order is from a Waaree
Energies step-down subsidiary, and the AGM includes approval of material
related party transactions with multiple group entities.
- Group restructuring activity: the company approved transfer of its
entire shareholding in Waaree Green Data Centers Private Limited
(formerly Sunsantional Energy Private Limited) to holding company Waaree
Energies Limited for Rs. 1,00,000 (face value Rs. 10 per share), with
the agreement and completion expected on or before October 31, 2026. The
subsidiary contributed Nil or negligible turnover, revenue, income, and
net worth in FY2025-26.
- The new data center subsidiary, Aurovault Data Centers Private
Limited, is newly incorporated with Nil turnover.
- Execution timelines: the 210MWp order and the 291 MWp solar + 280
MWh BESS order are both scheduled for completion in FY2027-28, leaving
execution risk over the intervening period.
- Macro and external factors cited by management: geopolitical
tensions, tariff uncertainties, supply chain adjustments, and regional
conflicts.
- The AGM notice includes an enabling resolution for conversion of
loan into equity under Section 62(3); management clarifies there are no
proposals of conversion pending or envisaged currently.
Copyright © 2023 SAS Data Analytics Pvt. Ltd. All rights reserved.
🐞