[ 1] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [ 2] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [ 3] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [ 4] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [ 5] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [ 6] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [ 7] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [ 8] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [ 9] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [ 10] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [ 11] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [ 12] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [ 13] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [ 14] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [ 15] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [ 16] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [ 17] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [ 18] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [ 19] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [ 20] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [ 21] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [ 22] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [ 23] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [ 24] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [ 25] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [ 26] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [ 27] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [ 28] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [ 29] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [ 30] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [ 31] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [ 32] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [ 33] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [ 34] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [ 35] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [ 36] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [ 37] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [ 38] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [ 39] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [ 40] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [ 41] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [ 42] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [ 43] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [ 44] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [ 45] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [ 46] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [ 47] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [ 48] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [ 49] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [ 50] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [ 51] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [ 52] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [ 53] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [ 54] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [ 55] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [ 56] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [ 57] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [ 58] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [ 59] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [ 60] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [ 61] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [ 62] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [ 63] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [ 64] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [ 65] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [ 66] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [ 67] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [ 68] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [ 69] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [ 70] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [ 71] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [ 72] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [ 73] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [ 74] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [ 75] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [ 76] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [ 77] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [ 78] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [ 79] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [ 80] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [ 81] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [ 82] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [ 83] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [ 84] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [ 85] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [ 86] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [ 87] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [ 88] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [ 89] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [ 90] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [ 91] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [ 92] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [ 93] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [ 94] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [ 95] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [ 96] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [ 97] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [ 98] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [ 99] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [100] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [101] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [102] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [103] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [104] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [105] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [106] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [107] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [108] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [109] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [110] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [111] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [112] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [113] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [114] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [115] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [116] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [117] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [118] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [119] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [120] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [121] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [122] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [123] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [124] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [125] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [126] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [127] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [128] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [129] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [130] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [131] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [132] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [133] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [134] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [135] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [136] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [137] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [138] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [139] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [140] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [141] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [142] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [143] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [144] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [145] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [146] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [147] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [148] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [149] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [150] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [151] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [152] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [153] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [154] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [155] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [156] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [157] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [158] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [159] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [160] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [161] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [162] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [163] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [164] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [165] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [166] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [167] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [168] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [169] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [170] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [171] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [172] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [173] Integrated Filing- Financial (2025-05-20)/AFR for the quarter and year ended 31st March, 2025 [174] Outcome of Board Meeting (2026-02-12)/Sadbhav Infrastructure Project Limited has informed the Exchange regarding Board meeting held on February 12, 2026. [175] Reply to Clarification- Financial results (2025-09-11)/The Exchange had sought clarification from BGR Energy Systems Limited for the quarter ended 30-Jun-2025 with respect to Regulation 33 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. On basis of above the Company was required to clarify the following: -1. Consolidated limited review report not submitted The response of the Company is enclosed. [176] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [177] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [178] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [179] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [180] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [181] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [182] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [183] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [184] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [185] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [186] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [187] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [188] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [189] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [190] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [191] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [192] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [193] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [194] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [195] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [196] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [197] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [198] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [199] Integrated Filing- Financial (2025-05-20)/AFR for the quarter and year ended 31st March, 2025 [200] Outcome of Board Meeting (2026-02-12)/Sadbhav Infrastructure Project Limited has informed the Exchange regarding Board meeting held on February 12, 2026. [201] Reply to Clarification- Financial results (2025-09-11)/The Exchange had sought clarification from BGR Energy Systems Limited for the quarter ended 30-Jun-2025 with respect to Regulation 33 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. On basis of above the Company was required to clarify the following: -1. Consolidated limited review report not submitted The response of the Company is enclosed. [202] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [203] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [204] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [205] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [206] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [207] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [208] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [209] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [210] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [211] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [212] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [213] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [214] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [215] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [216] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [217] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [218] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [219] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [220] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [221] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [222] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [223] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [224] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [225] Integrated Filing- Financial (2025-05-20)/AFR for the quarter and year ended 31st March, 2025 [226] Outcome of Board Meeting (2026-02-12)/Sadbhav Infrastructure Project Limited has informed the Exchange regarding Board meeting held on February 12, 2026. [227] Reply to Clarification- Financial results (2025-09-11)/The Exchange had sought clarification from BGR Energy Systems Limited for the quarter ended 30-Jun-2025 with respect to Regulation 33 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. On basis of above the Company was required to clarify the following: -1. Consolidated limited review report not submitted The response of the Company is enclosed. [228] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [229] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [230] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [231] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [232] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [233] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [234] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [235] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [236] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [237] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [238] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [239] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [240] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [241] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [242] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [243] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [244] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [245] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [246] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [247] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [248] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [249] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [250] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [251] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [252] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [253] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [254] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [255] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [256] Integrated Filing- Financial (2025-05-20)/AFR for the quarter and year ended 31st March, 2025 [257] Outcome of Board Meeting (2026-02-12)/Sadbhav Infrastructure Project Limited has informed the Exchange regarding Board meeting held on February 12, 2026. [258] Reply to Clarification- Financial results (2025-09-11)/The Exchange had sought clarification from BGR Energy Systems Limited for the quarter ended 30-Jun-2025 with respect to Regulation 33 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. On basis of above the Company was required to clarify the following: -1. Consolidated limited review report not submitted The response of the Company is enclosed. [259] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [260] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [261] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [262] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [263] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [264] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [265] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [266] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [267] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [268] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [269] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [270] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [271] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [272] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [273] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [274] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [275] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [276] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [277] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [278] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [279] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [280] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [281] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [282] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [283] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [284] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [285] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [286] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [287] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [288] Integrated Filing- Financial (2025-05-20)/AFR for the quarter and year ended 31st March, 2025 [289] Outcome of Board Meeting (2026-02-12)/Sadbhav Infrastructure Project Limited has informed the Exchange regarding Board meeting held on February 12, 2026. [290] Reply to Clarification- Financial results (2025-09-11)/The Exchange had sought clarification from BGR Energy Systems Limited for the quarter ended 30-Jun-2025 with respect to Regulation 33 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. On basis of above the Company was required to clarify the following: -1. Consolidated limited review report not submitted The response of the Company is enclosed. [291] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [292] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [293] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [294] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [295] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [296] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [297] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [298] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [299] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [300] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [301] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [302] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [303] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [304] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [305] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [306] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [307] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [308] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [309] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [310] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [311] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [312] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [313] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [314] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [315] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [316] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [317] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [318] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [319] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [320] Integrated Filing- Financial (2025-05-20)/AFR for the quarter and year ended 31st March, 2025 [321] Outcome of Board Meeting (2026-02-12)/Sadbhav Infrastructure Project Limited has informed the Exchange regarding Board meeting held on February 12, 2026. [322] Reply to Clarification- Financial results (2025-09-11)/The Exchange had sought clarification from BGR Energy Systems Limited for the quarter ended 30-Jun-2025 with respect to Regulation 33 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. On basis of above the Company was required to clarify the following: -1. Consolidated limited review report not submitted The response of the Company is enclosed. [323] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [324] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [325] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [326] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [327] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [328] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [329] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [330] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [331] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [332] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [333] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [334] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [335] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [336] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [337] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [338] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [339] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [340] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [341] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [342] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [343] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [344] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [345] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [346] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [347] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [348] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [349] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [350] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [351] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [352] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [353] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [354] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [355] Integrated Filing- Financial (2025-05-20)/AFR for the quarter and year ended 31st March, 2025 [356] Outcome of Board Meeting (2026-02-12)/Sadbhav Infrastructure Project Limited has informed the Exchange regarding Board meeting held on February 12, 2026. [357] Reply to Clarification- Financial results (2025-09-11)/The Exchange had sought clarification from BGR Energy Systems Limited for the quarter ended 30-Jun-2025 with respect to Regulation 33 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. On basis of above the Company was required to clarify the following: -1. Consolidated limited review report not submitted The response of the Company is enclosed. [358] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [359] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [360] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [361] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [362] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [363] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [364] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [365] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [366] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [367] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [368] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [369] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [370] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [371] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [372] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [373] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [374] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [375] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [376] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [377] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [378] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [379] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [380] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [381] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [382] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [383] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [384] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [385] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [386] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [387] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [388] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [389] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [390] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [391] Integrated Filing- Financial (2025-05-20)/AFR for the quarter and year ended 31st March, 2025 [392] Outcome of Board Meeting (2026-02-12)/Sadbhav Infrastructure Project Limited has informed the Exchange regarding Board meeting held on February 12, 2026. [393] Reply to Clarification- Financial results (2025-09-11)/The Exchange had sought clarification from BGR Energy Systems Limited for the quarter ended 30-Jun-2025 with respect to Regulation 33 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. On basis of above the Company was required to clarify the following: -1. Consolidated limited review report not submitted The response of the Company is enclosed. [394] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [395] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [396] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [397] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [398] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [399] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [400] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [401] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [402] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [403] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [404] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [405] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [406] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [407] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [408] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [409] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [410] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [411] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [412] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [413] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [414] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [415] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [416] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [417] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [418] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [419] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [420] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [421] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [422] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [423] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [424] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [425] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [426] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [427] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [428] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [429] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [430] Integrated Filing- Financial (2025-05-20)/AFR for the quarter and year ended 31st March, 2025 [431] Outcome of Board Meeting (2026-02-12)/Sadbhav Infrastructure Project Limited has informed the Exchange regarding Board meeting held on February 12, 2026. [432] Reply to Clarification- Financial results (2025-09-11)/The Exchange had sought clarification from BGR Energy Systems Limited for the quarter ended 30-Jun-2025 with respect to Regulation 33 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. On basis of above the Company was required to clarify the following: -1. Consolidated limited review report not submitted The response of the Company is enclosed. [433] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [434] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [435] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [436] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [437] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [438] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [439] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [440] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [441] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [442] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [443] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [444] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [445] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [446] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [447] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [448] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [449] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [450] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [451] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [452] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [453] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [454] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [455] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [456] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [457] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [458] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [459] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [460] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [461] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [462] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [463] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [464] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [465] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [466] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [467] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [468] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [469] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [470] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [471] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [472] Integrated Filing- Financial (2025-05-20)/AFR for the quarter and year ended 31st March, 2025 [473] Outcome of Board Meeting (2026-02-12)/Sadbhav Infrastructure Project Limited has informed the Exchange regarding Board meeting held on February 12, 2026. [474] Reply to Clarification- Financial results (2025-09-11)/The Exchange had sought clarification from BGR Energy Systems Limited for the quarter ended 30-Jun-2025 with respect to Regulation 33 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. On basis of above the Company was required to clarify the following: -1. Consolidated limited review report not submitted The response of the Company is enclosed. [475] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [476] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [477] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [478] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [479] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [480] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [481] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [482] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [483] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [484] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [485] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [486] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [487] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [488] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [489] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [490] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [491] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [492] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [493] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [494] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [495] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [496] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [497] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [498] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [499] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [500] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [501] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [502] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [503] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [504] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [505] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [506] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [507] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [508] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [509] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [510] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [511] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [512] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [513] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [514] Integrated Filing- Financial (2025-05-20)/AFR for the quarter and year ended 31st March, 2025 [515] Outcome of Board Meeting (2026-02-12)/Sadbhav Infrastructure Project Limited has informed the Exchange regarding Board meeting held on February 12, 2026. [516] Reply to Clarification- Financial results (2025-09-11)/The Exchange had sought clarification from BGR Energy Systems Limited for the quarter ended 30-Jun-2025 with respect to Regulation 33 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. On basis of above the Company was required to clarify the following: -1. Consolidated limited review report not submitted The response of the Company is enclosed. [517] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [518] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [519] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [520] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [521] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [522] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [523] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [524] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [525] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [526] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [527] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [528] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [529] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [530] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [531] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [532] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [533] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [534] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [535] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [536] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [537] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [538] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [539] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [540] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [541] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [542] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [543] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [544] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [545] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [546] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [547] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [548] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [549] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [550] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [551] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [552] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [553] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [554] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [555] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [556] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [557] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [558] Integrated Filing- Financial (2025-05-20)/AFR for the quarter and year ended 31st March, 2025 [559] Outcome of Board Meeting (2026-02-12)/Sadbhav Infrastructure Project Limited has informed the Exchange regarding Board meeting held on February 12, 2026. [560] Reply to Clarification- Financial results (2025-09-11)/The Exchange had sought clarification from BGR Energy Systems Limited for the quarter ended 30-Jun-2025 with respect to Regulation 33 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. On basis of above the Company was required to clarify the following: -1. Consolidated limited review report not submitted The response of the Company is enclosed. [561] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [562] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [563] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [564] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [565] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [566] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [567] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [568] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [569] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [570] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [571] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [572] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [573] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [574] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [575] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [576] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [577] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [578] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [579] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [580] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [581] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [582] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [583] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [584] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [585] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [586] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [587] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [588] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [589] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [590] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [591] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [592] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [593] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [594] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [595] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [596] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [597] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [598] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [599] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [600] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [601] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [602] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [603] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [604] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [605] Integrated Filing- Financial (2025-05-20)/AFR for the quarter and year ended 31st March, 2025 [606] Outcome of Board Meeting (2026-02-12)/Sadbhav Infrastructure Project Limited has informed the Exchange regarding Board meeting held on February 12, 2026. [607] Reply to Clarification- Financial results (2025-09-11)/The Exchange had sought clarification from BGR Energy Systems Limited for the quarter ended 30-Jun-2025 with respect to Regulation 33 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. On basis of above the Company was required to clarify the following: -1. Consolidated limited review report not submitted The response of the Company is enclosed. [608] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [609] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [610] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [611] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [612] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [613] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [614] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [615] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [616] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [617] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [618] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [619] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [620] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [621] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [622] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [623] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [624] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [625] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [626] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [627] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [628] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [629] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [630] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [631] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [632] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [633] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [634] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [635] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [636] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [637] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [638] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [639] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [640] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [641] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [642] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [643] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [644] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [645] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [646] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [647] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [648] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [649] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [650] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [651] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [652] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [653] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [654] Integrated Filing- Financial (2025-05-20)/AFR for the quarter and year ended 31st March, 2025 [655] Outcome of Board Meeting (2026-02-12)/Sadbhav Infrastructure Project Limited has informed the Exchange regarding Board meeting held on February 12, 2026. [656] Reply to Clarification- Financial results (2025-09-11)/The Exchange had sought clarification from BGR Energy Systems Limited for the quarter ended 30-Jun-2025 with respect to Regulation 33 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. On basis of above the Company was required to clarify the following: -1. Consolidated limited review report not submitted The response of the Company is enclosed. [657] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [658] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [659] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [660] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [661] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [662] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [663] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [664] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [665] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [666] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [667] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [668] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [669] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [670] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [671] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [672] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [673] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [674] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [675] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [676] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [677] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [678] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [679] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [680] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [681] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [682] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [683] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [684] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [685] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [686] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [687] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [688] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [689] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [690] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [691] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [692] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [693] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [694] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [695] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [696] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [697] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [698] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [699] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [700] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [701] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [702] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [703] Integrated Filing- Financial (2025-05-20)/AFR for the quarter and year ended 31st March, 2025 [704] Outcome of Board Meeting (2026-02-12)/Sadbhav Infrastructure Project Limited has informed the Exchange regarding Board meeting held on February 12, 2026. [705] Reply to Clarification- Financial results (2025-09-11)/The Exchange had sought clarification from BGR Energy Systems Limited for the quarter ended 30-Jun-2025 with respect to Regulation 33 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. On basis of above the Company was required to clarify the following: -1. Consolidated limited review report not submitted The response of the Company is enclosed. [706] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [707] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [708] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [709] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [710] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [711] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [712] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [713] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [714] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [715] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [716] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [717] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [718] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [719] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [720] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [721] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [722] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [723] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [724] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [725] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [726] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [727] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [728] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [729] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [730] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [731] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [732] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [733] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [734] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [735] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [736] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [737] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [738] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [739] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [740] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [741] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [742] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [743] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [744] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [745] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [746] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [747] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [748] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [749] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [750] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [751] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [752] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [753] Integrated Filing- Financial (2025-05-20)/AFR for the quarter and year ended 31st March, 2025 [754] Outcome of Board Meeting (2026-02-12)/Sadbhav Infrastructure Project Limited has informed the Exchange regarding Board meeting held on February 12, 2026. [755] Reply to Clarification- Financial results (2025-09-11)/The Exchange had sought clarification from BGR Energy Systems Limited for the quarter ended 30-Jun-2025 with respect to Regulation 33 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. On basis of above the Company was required to clarify the following: -1. Consolidated limited review report not submitted The response of the Company is enclosed. [756] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [757] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [758] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [759] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [760] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [761] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [762] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [763] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [764] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [765] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [766] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [767] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [768] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [769] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [770] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [771] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [772] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [773] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [774] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [775] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [776] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [777] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [778] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [779] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [780] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [781] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [782] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [783] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [784] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [785] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [786] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [787] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [788] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [789] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [790] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [791] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [792] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [793] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [794] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [795] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [796] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [797] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [798] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [799] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [800] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [801] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [802] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [803] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [804] Integrated Filing- Financial (2025-05-20)/AFR for the quarter and year ended 31st March, 2025 [805] Outcome of Board Meeting (2026-02-12)/Sadbhav Infrastructure Project Limited has informed the Exchange regarding Board meeting held on February 12, 2026. [806] Reply to Clarification- Financial results (2025-09-11)/The Exchange had sought clarification from BGR Energy Systems Limited for the quarter ended 30-Jun-2025 with respect to Regulation 33 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. On basis of above the Company was required to clarify the following: -1. Consolidated limited review report not submitted The response of the Company is enclosed. [807] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [808] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [809] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [810] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [811] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [812] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [813] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [814] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [815] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [816] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [817] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [818] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [819] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [820] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [821] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [822] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [823] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [824] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [825] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [826] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [827] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [828] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [829] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [830] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [831] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [832] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [833] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [834] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [835] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [836] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [837] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [838] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [839] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [840] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [841] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [842] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [843] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [844] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [845] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [846] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [847] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [848] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [849] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [850] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [851] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [852] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [853] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [854] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [855] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [856] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [857] Integrated Filing- Financial (2025-05-20)/AFR for the quarter and year ended 31st March, 2025 [858] Outcome of Board Meeting (2026-02-12)/Sadbhav Infrastructure Project Limited has informed the Exchange regarding Board meeting held on February 12, 2026. [859] Reply to Clarification- Financial results (2025-09-11)/The Exchange had sought clarification from BGR Energy Systems Limited for the quarter ended 30-Jun-2025 with respect to Regulation 33 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. On basis of above the Company was required to clarify the following: -1. Consolidated limited review report not submitted The response of the Company is enclosed. [860] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [861] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [862] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [863] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [864] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [865] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [866] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [867] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [868] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [869] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [870] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [871] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [872] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [873] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [874] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [875] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [876] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [877] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [878] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [879] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [880] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [881] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [882] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [883] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [884] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [885] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [886] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [887] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [888] Press Release (2026-02-10)/Afcons Infrastructure Limited has informed the Exchange regarding a press release dated February 10, 2026, titled "Unaudited Financial Result for the Quarter and Nine Months ended December 2025". [889] Outcome of Board Meeting (2026-01-30)/PSP Projects Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [890] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [891] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [892] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [893] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [894] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [895] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [896] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [897] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [898] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [899] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [900] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [901] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [902] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [903] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [904] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [905] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [906] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [907] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [908] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [909] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [910] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [911] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [912] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [913] Integrated Filing- Financial (2025-05-20)/AFR for the quarter and year ended 31st March, 2025 [914] Outcome of Board Meeting (2026-02-12)/Sadbhav Infrastructure Project Limited has informed the Exchange regarding Board meeting held on February 12, 2026. [915] Reply to Clarification- Financial results (2025-09-11)/The Exchange had sought clarification from BGR Energy Systems Limited for the quarter ended 30-Jun-2025 with respect to Regulation 33 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. On basis of above the Company was required to clarify the following: -1. Consolidated limited review report not submitted The response of the Company is enclosed. [916] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [917] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [918] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [919] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [920] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [921] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [922] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [923] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [924] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [925] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [926] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [927] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [928] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [929] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [930] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [931] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [932] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [933] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [934] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [935] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [936] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [937] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [938] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [939] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [940] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [941] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [942] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [943] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [944] Press Release (2026-02-10)/Afcons Infrastructure Limited has informed the Exchange regarding a press release dated February 10, 2026, titled "Unaudited Financial Result for the Quarter and Nine Months ended December 2025". [945] Outcome of Board Meeting (2026-01-30)/PSP Projects Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [946] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [947] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [948] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [949] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [950] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [951] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [952] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [953] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [954] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [955] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [956] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [957] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [958] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [959] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [960] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [961] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [962] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [963] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [964] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [965] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [966] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [967] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [968] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [969] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [970] Integrated Filing- Financial (2025-05-20)/AFR for the quarter and year ended 31st March, 2025 [971] Outcome of Board Meeting (2026-02-12)/Sadbhav Infrastructure Project Limited has informed the Exchange regarding Board meeting held on February 12, 2026. [972] Reply to Clarification- Financial results (2025-09-11)/The Exchange had sought clarification from BGR Energy Systems Limited for the quarter ended 30-Jun-2025 with respect to Regulation 33 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. On basis of above the Company was required to clarify the following: -1. Consolidated limited review report not submitted The response of the Company is enclosed. [973] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [974] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [975] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [976] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [977] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [978] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [979] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [980] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [981] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [982] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [983] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [984] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [985] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [986] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [987] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [988] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [989] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [990] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [991] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [992] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [993] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [994] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [995] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [996] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [997] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [998] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [999] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1000] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [1001] Press Release (2026-02-10)/Afcons Infrastructure Limited has informed the Exchange regarding a press release dated February 10, 2026, titled "Unaudited Financial Result for the Quarter and Nine Months ended December 2025". [1002] Outcome of Board Meeting (2026-01-30)/PSP Projects Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [1003] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1004] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1005] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1006] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1007] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1008] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1009] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [1010] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [1011] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [1012] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [1013] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [1014] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [1015] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [1016] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1017] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1018] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [1019] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [1020] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1021] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1022] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1023] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1024] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1025] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [1026] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1027] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1028] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [1029] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [1030] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [1031] Integrated Filing- Financial (2025-05-20)/AFR for the quarter and year ended 31st March, 2025 [1032] Outcome of Board Meeting (2026-02-12)/Sadbhav Infrastructure Project Limited has informed the Exchange regarding Board meeting held on February 12, 2026. [1033] Reply to Clarification- Financial results (2025-09-11)/The Exchange had sought clarification from BGR Energy Systems Limited for the quarter ended 30-Jun-2025 with respect to Regulation 33 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. On basis of above the Company was required to clarify the following: -1. Consolidated limited review report not submitted The response of the Company is enclosed. [1034] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [1035] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1036] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [1037] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [1038] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1039] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [1040] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [1041] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [1042] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1043] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1044] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1045] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1046] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1047] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1048] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [1049] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1050] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1051] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1052] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1053] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1054] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1055] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1056] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1057] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1058] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [1059] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1060] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1061] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [1062] Press Release (2026-02-10)/Afcons Infrastructure Limited has informed the Exchange regarding a press release dated February 10, 2026, titled "Unaudited Financial Result for the Quarter and Nine Months ended December 2025". [1063] Outcome of Board Meeting (2026-01-30)/PSP Projects Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [1064] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1065] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1066] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1067] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1068] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1069] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [1070] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [1071] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1072] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [1073] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [1074] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [1075] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [1076] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [1077] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [1078] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [1079] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1080] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1081] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [1082] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [1083] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1084] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1085] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1086] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1087] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1088] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [1089] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1090] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1091] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [1092] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [1093] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [1094] Integrated Filing- Financial (2025-05-20)/AFR for the quarter and year ended 31st March, 2025 [1095] Outcome of Board Meeting (2026-02-12)/Sadbhav Infrastructure Project Limited has informed the Exchange regarding Board meeting held on February 12, 2026. [1096] Reply to Clarification- Financial results (2025-09-11)/The Exchange had sought clarification from BGR Energy Systems Limited for the quarter ended 30-Jun-2025 with respect to Regulation 33 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. On basis of above the Company was required to clarify the following: -1. Consolidated limited review report not submitted The response of the Company is enclosed. [1097] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [1098] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1099] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [1100] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [1101] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1102] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [1103] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [1104] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [1105] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1106] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1107] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1108] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1109] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1110] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1111] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [1112] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1113] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1114] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1115] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1116] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1117] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1118] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1119] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1120] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1121] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [1122] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1123] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1124] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [1125] Press Release (2026-02-10)/Afcons Infrastructure Limited has informed the Exchange regarding a press release dated February 10, 2026, titled "Unaudited Financial Result for the Quarter and Nine Months ended December 2025". [1126] Outcome of Board Meeting (2026-01-30)/PSP Projects Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [1127] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1128] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1129] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1130] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1131] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1132] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [1133] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [1134] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1135] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [1136] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [1137] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [1138] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [1139] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [1140] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [1141] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [1142] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1143] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1144] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [1145] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [1146] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1147] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1148] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1149] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1150] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1151] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [1152] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1153] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1154] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [1155] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [1156] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [1157] Integrated Filing- Financial (2025-05-20)/AFR for the quarter and year ended 31st March, 2025 [1158] Outcome of Board Meeting (2026-02-12)/Sadbhav Infrastructure Project Limited has informed the Exchange regarding Board meeting held on February 12, 2026. [1159] Reply to Clarification- Financial results (2025-09-11)/The Exchange had sought clarification from BGR Energy Systems Limited for the quarter ended 30-Jun-2025 with respect to Regulation 33 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. On basis of above the Company was required to clarify the following: -1. Consolidated limited review report not submitted The response of the Company is enclosed. [1160] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [1161] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1162] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [1163] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [1164] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1165] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [1166] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [1167] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [1168] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1169] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1170] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1171] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1172] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1173] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1174] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [1175] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1176] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1177] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1178] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1179] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1180] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1181] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1182] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1183] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1184] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [1185] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1186] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1187] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [1188] Press Release (2026-02-10)/Afcons Infrastructure Limited has informed the Exchange regarding a press release dated February 10, 2026, titled "Unaudited Financial Result for the Quarter and Nine Months ended December 2025". [1189] Outcome of Board Meeting (2026-01-30)/PSP Projects Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [1190] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1191] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1192] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1193] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1194] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1195] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [1196] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [1197] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-17)/Mold-Tek Technologies Limited has informed the Exchange about Transcript [1198] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-17)/Mold-Tek Technologies Limited has informed the Exchange about Transcript [1199] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1200] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [1201] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [1202] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [1203] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [1204] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [1205] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [1206] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [1207] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1208] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1209] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [1210] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [1211] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1212] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1213] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1214] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1215] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1216] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [1217] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1218] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1219] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [1220] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [1221] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [1222] Integrated Filing- Financial (2025-05-20)/AFR for the quarter and year ended 31st March, 2025 [1223] Outcome of Board Meeting (2026-02-12)/Sadbhav Infrastructure Project Limited has informed the Exchange regarding Board meeting held on February 12, 2026. [1224] Reply to Clarification- Financial results (2025-09-11)/The Exchange had sought clarification from BGR Energy Systems Limited for the quarter ended 30-Jun-2025 with respect to Regulation 33 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. On basis of above the Company was required to clarify the following: -1. Consolidated limited review report not submitted The response of the Company is enclosed. [1225] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [1226] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1227] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [1228] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [1229] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1230] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [1231] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [1232] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [1233] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1234] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1235] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1236] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1237] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1238] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1239] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [1240] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1241] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1242] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1243] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1244] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1245] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1246] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1247] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1248] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1249] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [1250] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1251] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1252] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [1253] Press Release (2026-02-10)/Afcons Infrastructure Limited has informed the Exchange regarding a press release dated February 10, 2026, titled "Unaudited Financial Result for the Quarter and Nine Months ended December 2025". [1254] Outcome of Board Meeting (2026-01-30)/PSP Projects Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [1255] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1256] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1257] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1258] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1259] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1260] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [1261] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [1262] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-17)/Mold-Tek Technologies Limited has informed the Exchange about Transcript [1263] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-17)/Mold-Tek Technologies Limited has informed the Exchange about Transcript [1264] Press Release (2026-02-12)/Mold-Tek Technologies Limited has informed the Exchange regarding a press release dated February 12, 2026, titled "Press Release". [1265] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1266] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [1267] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [1268] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [1269] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [1270] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [1271] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [1272] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [1273] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1274] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1275] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [1276] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [1277] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1278] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1279] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1280] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1281] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1282] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [1283] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1284] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1285] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [1286] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [1287] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [1288] Integrated Filing- Financial (2025-05-20)/AFR for the quarter and year ended 31st March, 2025 [1289] Outcome of Board Meeting (2026-02-12)/Sadbhav Infrastructure Project Limited has informed the Exchange regarding Board meeting held on February 12, 2026. [1290] Reply to Clarification- Financial results (2025-09-11)/The Exchange had sought clarification from BGR Energy Systems Limited for the quarter ended 30-Jun-2025 with respect to Regulation 33 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. On basis of above the Company was required to clarify the following: -1. Consolidated limited review report not submitted The response of the Company is enclosed. [1291] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [1292] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1293] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [1294] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [1295] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1296] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [1297] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [1298] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [1299] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1300] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1301] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1302] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1303] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1304] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1305] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [1306] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1307] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1308] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1309] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1310] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1311] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1312] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1313] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1314] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1315] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [1316] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1317] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1318] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [1319] Press Release (2026-02-10)/Afcons Infrastructure Limited has informed the Exchange regarding a press release dated February 10, 2026, titled "Unaudited Financial Result for the Quarter and Nine Months ended December 2025". [1320] Outcome of Board Meeting (2026-01-30)/PSP Projects Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [1321] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1322] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1323] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1324] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1325] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1326] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [1327] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [1328] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-17)/Mold-Tek Technologies Limited has informed the Exchange about Transcript [1329] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-17)/Mold-Tek Technologies Limited has informed the Exchange about Transcript [1330] Press Release (2026-02-12)/Mold-Tek Technologies Limited has informed the Exchange regarding a press release dated February 12, 2026, titled "Press Release". [1331] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-17)/Mold-Tek Technologies Limited has informed the Exchange about Transcript [1332] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-17)/Mold-Tek Technologies Limited has informed the Exchange about Transcript [1333] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-17)/Mold-Tek Technologies Limited has informed the Exchange about Transcript [1334] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-17)/Mold-Tek Technologies Limited has informed the Exchange about Transcript [1335] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1336] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [1337] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [1338] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [1339] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [1340] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [1341] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [1342] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [1343] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1344] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1345] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [1346] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [1347] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1348] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1349] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1350] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1351] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1352] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [1353] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1354] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1355] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [1356] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [1357] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [1358] Integrated Filing- Financial (2025-05-20)/AFR for the quarter and year ended 31st March, 2025 [1359] Outcome of Board Meeting (2026-02-12)/Sadbhav Infrastructure Project Limited has informed the Exchange regarding Board meeting held on February 12, 2026. [1360] Reply to Clarification- Financial results (2025-09-11)/The Exchange had sought clarification from BGR Energy Systems Limited for the quarter ended 30-Jun-2025 with respect to Regulation 33 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. On basis of above the Company was required to clarify the following: -1. Consolidated limited review report not submitted The response of the Company is enclosed. [1361] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [1362] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1363] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [1364] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [1365] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1366] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [1367] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [1368] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [1369] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1370] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1371] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1372] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1373] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1374] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1375] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [1376] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1377] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1378] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1379] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1380] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1381] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1382] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1383] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1384] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1385] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [1386] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1387] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1388] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [1389] Press Release (2026-02-10)/Afcons Infrastructure Limited has informed the Exchange regarding a press release dated February 10, 2026, titled "Unaudited Financial Result for the Quarter and Nine Months ended December 2025". [1390] Outcome of Board Meeting (2026-01-30)/PSP Projects Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [1391] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1392] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1393] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1394] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1395] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1396] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [1397] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [1398] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-17)/Mold-Tek Technologies Limited has informed the Exchange about Transcript [1399] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-17)/Mold-Tek Technologies Limited has informed the Exchange about Transcript [1400] Press Release (2026-02-12)/Mold-Tek Technologies Limited has informed the Exchange regarding a press release dated February 12, 2026, titled "Press Release". [1401] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-17)/Mold-Tek Technologies Limited has informed the Exchange about Transcript [1402] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-17)/Mold-Tek Technologies Limited has informed the Exchange about Transcript [1403] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-17)/Mold-Tek Technologies Limited has informed the Exchange about Transcript [1404] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-17)/Mold-Tek Technologies Limited has informed the Exchange about Transcript [1405] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-17)/Mold-Tek Technologies Limited has informed the Exchange about Transcript [1406] Press Release (2026-02-12)/Mold-Tek Technologies Limited has informed the Exchange regarding a press release dated February 12, 2026, titled "Press Release". [1407] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1408] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [1409] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [1410] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [1411] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [1412] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [1413] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [1414] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [1415] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1416] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1417] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [1418] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [1419] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1420] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1421] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1422] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1423] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1424] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [1425] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1426] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1427] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [1428] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [1429] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [1430] Integrated Filing- Financial (2025-05-20)/AFR for the quarter and year ended 31st March, 2025 [1431] Outcome of Board Meeting (2026-02-12)/Sadbhav Infrastructure Project Limited has informed the Exchange regarding Board meeting held on February 12, 2026. [1432] Reply to Clarification- Financial results (2025-09-11)/The Exchange had sought clarification from BGR Energy Systems Limited for the quarter ended 30-Jun-2025 with respect to Regulation 33 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. On basis of above the Company was required to clarify the following: -1. Consolidated limited review report not submitted The response of the Company is enclosed. [1433] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [1434] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1435] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [1436] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [1437] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1438] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [1439] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [1440] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [1441] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1442] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1443] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1444] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1445] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1446] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1447] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [1448] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1449] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1450] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1451] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1452] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1453] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1454] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1455] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1456] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1457] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [1458] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1459] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1460] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [1461] Press Release (2026-02-10)/Afcons Infrastructure Limited has informed the Exchange regarding a press release dated February 10, 2026, titled "Unaudited Financial Result for the Quarter and Nine Months ended December 2025". [1462] Outcome of Board Meeting (2026-01-30)/PSP Projects Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [1463] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1464] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1465] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1466] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1467] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1468] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [1469] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [1470] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-17)/Mold-Tek Technologies Limited has informed the Exchange about Transcript [1471] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-17)/Mold-Tek Technologies Limited has informed the Exchange about Transcript [1472] Press Release (2026-02-12)/Mold-Tek Technologies Limited has informed the Exchange regarding a press release dated February 12, 2026, titled "Press Release". [1473] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-17)/Mold-Tek Technologies Limited has informed the Exchange about Transcript [1474] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-17)/Mold-Tek Technologies Limited has informed the Exchange about Transcript [1475] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-17)/Mold-Tek Technologies Limited has informed the Exchange about Transcript [1476] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-17)/Mold-Tek Technologies Limited has informed the Exchange about Transcript [1477] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-17)/Mold-Tek Technologies Limited has informed the Exchange about Transcript [1478] Press Release (2026-02-12)/Mold-Tek Technologies Limited has informed the Exchange regarding a press release dated February 12, 2026, titled "Press Release". [1479] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1480] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [1481] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [1482] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [1483] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [1484] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [1485] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [1486] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [1487] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1488] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1489] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [1490] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [1491] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1492] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1493] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1494] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1495] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1496] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [1497] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1498] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1499] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [1500] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [1501] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [1502] Integrated Filing- Financial (2025-05-20)/AFR for the quarter and year ended 31st March, 2025 [1503] Outcome of Board Meeting (2026-02-12)/Sadbhav Infrastructure Project Limited has informed the Exchange regarding Board meeting held on February 12, 2026. [1504] Reply to Clarification- Financial results (2025-09-11)/The Exchange had sought clarification from BGR Energy Systems Limited for the quarter ended 30-Jun-2025 with respect to Regulation 33 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. On basis of above the Company was required to clarify the following: -1. Consolidated limited review report not submitted The response of the Company is enclosed. [1505] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [1506] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1507] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [1508] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [1509] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1510] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [1511] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [1512] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [1513] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1514] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1515] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1516] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1517] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1518] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1519] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [1520] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1521] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1522] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1523] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1524] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1525] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1526] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1527] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1528] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1529] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [1530] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1531] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1532] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [1533] Press Release (2026-02-10)/Afcons Infrastructure Limited has informed the Exchange regarding a press release dated February 10, 2026, titled "Unaudited Financial Result for the Quarter and Nine Months ended December 2025". [1534] Outcome of Board Meeting (2026-01-30)/PSP Projects Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [1535] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1536] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1537] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1538] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1539] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1540] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [1541] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [1542] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-17)/Mold-Tek Technologies Limited has informed the Exchange about Transcript [1543] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-17)/Mold-Tek Technologies Limited has informed the Exchange about Transcript [1544] Press Release (2026-02-12)/Mold-Tek Technologies Limited has informed the Exchange regarding a press release dated February 12, 2026, titled "Press Release". [1545] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-17)/Mold-Tek Technologies Limited has informed the Exchange about Transcript [1546] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-17)/Mold-Tek Technologies Limited has informed the Exchange about Transcript [1547] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-17)/Mold-Tek Technologies Limited has informed the Exchange about Transcript [1548] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-17)/Mold-Tek Technologies Limited has informed the Exchange about Transcript [1549] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-17)/Mold-Tek Technologies Limited has informed the Exchange about Transcript [1550] Press Release (2026-02-12)/Mold-Tek Technologies Limited has informed the Exchange regarding a press release dated February 12, 2026, titled "Press Release". [1551] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1552] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [1553] Press Release (2026-02-05)/J.Kumar Infraprojects Limited has informed the Exchange regarding a press release dated February 05, 2026, titled "The Un-Audited Standalone and Consolidated Financial Results for the Quarter and Nine months ended as on 31st December, 2025.". [1554] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [1555] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-22)/GK Energy Limited has informed the Exchange about Transcript [1556] General Updates (2026-02-09)/J. Kumar Infraprojects Limited has informed the Exchange that pursuant to the Regulation 30(6) of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find enclosed herewith the transcript of the Conference Call held on February 06, 2026. [1557] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [1558] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [1559] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1560] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1561] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [1562] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-20)/NBCC (India) Limited has informed the Exchange about Transcript [1563] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1564] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1565] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1566] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1567] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1568] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [1569] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1570] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1571] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [1572] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [1573] Outcome of Board Meeting (2026-02-14)/Sadbhav Engineering Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [1574] Integrated Filing- Financial (2025-05-20)/AFR for the quarter and year ended 31st March, 2025 [1575] Outcome of Board Meeting (2026-02-12)/Sadbhav Infrastructure Project Limited has informed the Exchange regarding Board meeting held on February 12, 2026. [1576] Reply to Clarification- Financial results (2025-09-11)/The Exchange had sought clarification from BGR Energy Systems Limited for the quarter ended 30-Jun-2025 with respect to Regulation 33 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. On basis of above the Company was required to clarify the following: -1. Consolidated limited review report not submitted The response of the Company is enclosed. [1577] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-18)/Vishnu Prakash R Punglia Limited has informed the Exchange about Transcript [1578] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1579] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [1580] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-17)/Ircon International Limited has informed the Exchange about Transcript [1581] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1582] Analysts/Institutional Investor Meet/Con. Call Updates (2025-11-19)/HEC Infra Projects Limited has informed the Exchange about Transcript [1583] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [1584] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-14)/Dilip Buildcon Limited has informed the Exchange about Transcript [1585] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1586] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1587] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1588] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-10)/NCC Limited has informed the Exchange about Transcript [1589] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1590] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1591] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-23)/Globe Civil Projects Limited has informed the Exchange about Transcript [1592] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/PNC Infratech Limited has informed the Exchange about Transcript [1593] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1594] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1595] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1596] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1597] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-12)/G R Infraprojects Limited has informed the Exchange about Transcript [1598] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1599] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1600] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1601] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [1602] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1603] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1604] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Capacite Infraprojects Limited has informed the Exchange about Transcript [1605] Press Release (2026-02-10)/Afcons Infrastructure Limited has informed the Exchange regarding a press release dated February 10, 2026, titled "Unaudited Financial Result for the Quarter and Nine Months ended December 2025". [1606] Outcome of Board Meeting (2026-01-30)/PSP Projects Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025. [1607] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1608] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1609] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-16)/Isgec Heavy Engineering Limited has informed the Exchange about Transcript of the Conference Call/ Meet to discuss the financial performance of the Company for the quarter and nine months ended December 31, 2025 [1610] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1611] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-19)/Ahluwalia Contracts (India) Limited has informed the Exchange about Transcript [1612] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [1613] Analysts/Institutional Investor Meet/Con. Call Updates (2026-03-16)/Markolines Pavement Technologies Limited has informed the Exchange about Transcript [1614] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-17)/Mold-Tek Technologies Limited has informed the Exchange about Transcript [1615] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-17)/Mold-Tek Technologies Limited has informed the Exchange about Transcript [1616] Press Release (2026-02-12)/Mold-Tek Technologies Limited has informed the Exchange regarding a press release dated February 12, 2026, titled "Press Release". [1617] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-17)/Mold-Tek Technologies Limited has informed the Exchange about Transcript [1618] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-17)/Mold-Tek Technologies Limited has informed the Exchange about Transcript [1619] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-17)/Mold-Tek Technologies Limited has informed the Exchange about Transcript [1620] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-17)/Mold-Tek Technologies Limited has informed the Exchange about Transcript [1621] Analysts/Institutional Investor Meet/Con. Call Updates (2026-02-17)/Mold-Tek Technologies Limited has informed the Exchange about Transcript [1622] Press Release (2026-02-12)/Mold-Tek Technologies Limited has informed the Exchange regarding a press release dated February 12, 2026, titled "Press Release".